Disley, Stockport

LOCATION: Redhouse Lane, Disley, Stockport, SK12 2

MAIN CONTRACTOR: Persimmon Homes

ECOCRIB SYSTEM: Mass Gravity

FACE AREA: 450m²

MAX RETAINED HEIGHT: 4m

CONSTRUCTION TIME: 2 Weeks

DESIGNERS: Geoman Limited

All material used to back fill the wall on this scheme were recycled demolished materials from the site that it was built on. 

Click to watch construction video!

« Back to Case Studies