Derby Leisure Centre, B + K

Location: Derby

Main Contractor: Bowmer and Kirkland

Ecocrib System: Mass Gravity with planting shelves built into the front face

Face Area: 198 m2

Maximum Retained Height: 4.8m

Plastic Waste Diverted From Landfill: 11 tonnes

Designer: Geoman Ltd

Click Here to see a Video of the Works

Click Here to see another Video of the Works

« Back to Case Studies