Location: A14/M11 Cambridge Northern Bypass
Client: Highways England.
Main Contractor: A14 Integrated Delivery Team. EcoCrib system: Mass Gravity.
Max.Retained height: 5.4m.
Face Area: 1838 MSQ.
Plastic waste diverted from landfill: 212 tonne
Click Here to download the Case Study
Click Here to watch a Video of Wall 1
Click Here to watch a Video of Wall 2
Click Here to watch a Video of Wall 3