A14 Section 5, Cambridge

Location: A14/M11 Cambridge Northern Bypass

Client: Highways England.

Main Contractor: A14 Integrated Delivery Team. EcoCrib system: Mass Gravity.

Max.Retained height: 5.4m.

Face Area: 1838 MSQ.

Plastic waste diverted from landfill: 212 tonne